ARTICLE 194-T:
For the evaluation of each request and, where appropriate, authorization of the following activities in the field of hazardous waste, the right to prevent and control pollution will be paid, in accordance with the following fees:
Operation of units for the collection and transport of hazardous waste ............................................. $ 4,534.00
Installation and operation of hazardous waste collection and storage centers .............................................. $ 4,532.00
Installation and operation of recycling or coprocessing systems for hazardous waste .............................................. $ 2,861.00
Installation and operation of hazardous waste reuse systems ......? $ 2,861.00
Installation and operation of hazardous waste treatment systems ....... $ 7,470.00
Installation and operation of hazardous waste incineration systems ....... $ 60,209.00
Installation and operation of systems for the confinement or final disposal of hazardous waste ....................................... $ 99,141.00
Provision of hazardous waste management services .............. $ 7,085.00
For requests for transfer, modification or extension of the authorization granted, 50% of the fee established in this article will be paid.
The organized microgenerators that submit the requests referred to in section I of this article will pay 50% of the fee established in this article.